|
MSC minutes |
||
|
|
||
|
The meeting was opened by Peter Howison at The Minutes were available for discussion. Septic and Phosphorus Jerry Wasserburg asked for more information on the Septic System Maintenance Record report. He also wanted to learn more about how “failures” would be handled. Susie Navetta and Jerry will work on the evaluation form. Jerry said we should use the EPA standards for years between evaluations. Dave Bellemore said we should wait until later to modify Ordinance 173. We talked about hiring Mark Chernaik to write a grant for residents who could not afford to bring the septics to higher standards after failure. Jerry said “Let’s wait and see”. Johan thought we should seek out side help for funding. DEQ will be having a meeting at the end of September with this information. The new Higher Standards for Septic Systems will include phosphorus and fertilizer verbage limiting phosphorus to lees than .05% by weight and limiting nitrogen to 30 miligrams per liter. It will be important to cross reference the Higher Standards Septic System Ordinance with Ordinance 173. Lisomitor ports will be installed in the drainfields for sampling Erosion Control (during construction and development) Ordinance.
It was learned that Denise Kalakay (LCOG) thinks we should have contractors bonds for properties with unusual circumstances. Stormwater Management will come into play after the property has been developed. Work Session before the Council meeting Present the 5 most important things in 3 to 5 minutes and give copies to councilors 1. Erosion control 2. Stormwater Runoff 3. 155/156 4. Higher Septic Standards 5. Fertilziers TASKS *Johan will write a letter to DLCD. * Jerry will work with Susie on the Inspection form and the EPA regulations for the septic system ordinance. Meeting adjourned at
Respectfully submitted, Susie Navetta
|